Energy Audit 1 site audited 36% of potential energy savings 30% of potential cost savings De Dietrich is a renowned and innovative company with a rich history dating back to the 17th century. Specialising in the manufacturing of high-quality industrial equipment, the company has established itself as a global leader in various sectors, including industrial boilers, heating systems, glass-lined equipment, and more. De Dietrich’s commitment to excellence and sustainability is evident in its cutting-edge products designed to meet the evolving needs of industries worldwide. The project began with a comprehensive analysis of consumption data, energy invoices, and the existing metering system at the Semur-en-Auxois production site. On-site measurements provided an accurate assessment of energy usage patterns. Both theoretical and actual energy consumption were carefully examined, utilising technical measurements and invoice analysis. The project concluded with a presentation of findings, identifying energy-saving opportunities, accompanied by cost estimates and a structured action plan for improved energy efficiency. Helexia also presented four action scenario and discussed practical implementation with De Dietrich. “In line with our commitment to the environment, the energy audit carried out at our Semur-en-Auxois site enabled us to identify a total potential reduction of 711 MWh per year, corresponding to 115 tonnes of CO2 avoided annually.” Michel Karcher, De Dietrich
Project details
Company Description
Service Description
QHSE Manager
Other references